Refinery plant expansion: piping and stress analysis
IndustryRefining
DisciplinePiping and stress analysis
ModeOn the client's 3D design platform
DeliverableOptimised routings, isometrics and stress reports
The challenge
Expanding an operating plant means fitting new piping among existing structures, equipment and lines, resolving every clash without stopping the plant, and proving by calculation that the new routings comply.
Scope
Clash resolution between new and existing lines in the 3D model